Tuesday, March 8, 2011

2011-03-08 GE


Drywall in Master Bedroom has been taped. Baseboard and ceiling molding have been installed.


Cement board and drywall in Master Bath have been taped.


Drywall in master Bedroom closets has been taped.


Drywall in 2nd Bedroom has been taped. Baseboard and ceiling molding have been installed.


Drywall in Guest Bathroom has been taped.


Drywall in Guest Bathroom has been taped.


Drywall has been taped throughout Corridor. Baseboard and crown moldings have been installed.

2011-03-08 1E


1st coat of paint has been applied to 3rd bedroom. Wood floors have been installed.

Monday, March 7, 2011

2011-03-07 3W


Dining Room and Kitchen are being drywalled.


Kitchen is being drywalled.


Living Room is being drywalled.


Living Room is being drywalled.


3rd Bedroom has been drywalled.


Drywall is being installed in rear corridor.

2011-03-07 3E


Dining Room and Kitchen are being drywalled.


Dining Room and Kitchen are being drywalled.


Living Room is being drywalled.


Living Room is being drywalled.

2011-03-07 1E


Floors are being installed in back half of unit.


Floors are being installed in back half of unit in corridor.

2011-03-07 1W


Worker taping drywall inside Master Bedroom closets.


Master Bath has been drywalled and taped.


Master Bath has been drywalled and taped. Plywood subfloor is in place.


Doors and various construction supplies are temporarily stored in Living Room.


Doors and various construction supplies are temporarily stored in Living Room. Kitchen cabinets are covered with plastic. Counter tops are covered with Styrofoam boards.

Saturday, March 5, 2011

2011-03-05 2E


Jacuzzi tub covered with drywall ready for tile.


Jacuzzi tub covered with drywall ready for tile.