Saturday, February 5, 2011

2011-02-05 Ice Dam - Damn Ice!


Ice Dam forms at gutter and downspout on east end of building.


Ice Dam along entire length of downspout on east side of building.


Ice Dam goes down to a solid block of ice at ground level.


Ice Dam goes down to a solid block of ice at ground level.


Ice Dam engulfs south east corner of exterior wall.

Friday, February 4, 2011

2011-02-04 3E


Existing masonry walls and wood framing have been painted with mold resistant paint in Dining Room.


Existing masonry walls and wood framing have been painted with mold resistant paint in Dining Room and Kitchen.


Existing masonry walls and wood framing have been painted with mold resistant paint in Living Room.


Existing masonry walls and wood framing have been painted with mold resistant paint in 3rd Bedroom.


Existing masonry walls and wood framing have been painted with mold resistant paint in 2nd Bedroom.


Existing masonry walls and wood framing have been painted with mold resistant paint in 2nd Bedroom & Master Bedroom.


Existing masonry walls and wood framing have been painted with mold resistant paint in Master Bathroom.


Existing masonry walls, wood framing and pipes in Laundry Closet have been painted with mold resistant paint.

2011-02-04 2E


Drywall installed in Master Bedroom.


Drywall installed in Master Bedroom.


Water resistant drywall has been installed in washroom except at bathtub/shower where cement board has been installed.


Drywall installed in 2nd Bedroom.


Drywall installed in 2nd Bedroom.


Drywall installed in corridor.

Thursday, February 3, 2011

2011-02-03 1E


Drywall has been installed Master Bedroom.


Drywall has been installed in Master Bedroom Closets.


Drywall has been installed over south wall around door and windows.


Water resistant greenboard drywall has been installed in washroom except around tub/shower.


Drywall has been installed in Corridor leading to back door.

Tuesday, February 1, 2011

2011-02-01 3E


South half of condo unit has been painted with mold resistant paint.


South wall of Master Bedroom has been painted with mold resistant paint.

2011-02-01 2E


New insulation has been installed over south exterior wall. Perimeter of window and door openings have been either caulked, sealed and insulated.


New insulation has been installed over south exterior wall. Perimeter of window and door openings have been either caulked, sealed and insulated.

2011-02-01 1E


New insulation has been installed over south exterior wall. Perimeter of window and door openings have been either caulked, sealed and insulated.


New insulation has been installed over south exterior wall. Perimeter of window and door openings have been either caulked, sealed and insulated.