Friday, August 6, 2010
2010-08-04 - Unit GE
Unit GE – Finished floor and baseboards in master bedroom have been removed. Pools of water are found on top of concrete slab-on-grade. Bedroom door, closet doors and vanity are sitting in pools of water.
Unit GE – Whirlpool bathtub sits on plywood. Plywood is soaking wet.
Unit GE – Master bathroom floor is covered with rain water.
Unit GE – Wall between master bath and bedroom corridor have been removed exposing rear of electric panel.
Unit GE – Finished floor, base board and gyp board have been removed from corridor. Concrete floor slab is covered with water.
Unit GE – Exterior wall in master bedroom below window sill and including window sill are covered with new mold growth.
Unit GE – Mold is starting to grow on walls of Washer/Dryer closet.
Unit GE – Steel beam appears to be supported by wood stud wall.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment