Sunday, October 24, 2010
2010-10-06
View from unit 3W looking into Dining/Kitchen area with demising wall in background. Top of demising wall has to be modified to accept new joists.
View of existing framing from roof, above unit 3E.
View of existing joists from roof, above unit 3E Masterbedroom.
Newly installed joists sit on top of demising wall between unit 3E & 3W. Ends of joists are wrapped with moisture barrier. New plywood decking fastened to joists.
View of roof looking south. West portion of roof has new joists, and new decking covered with blue tarp. East portion of roof is being worked on.