Sunday, February 27, 2011

2011-02-27 3W


West wall of Master Bedroom is fully insulated.

2011-02-27 3E


Electricians are installing lights in Kitchen/Dining area.


Electricians are installing lights in Kitchen/Dining area.


Master Bedroom walls are fully insulated.


Master Bedroom walls are fully insulated.

2011-02-27 Stairway


View of skylight in stair well shows all framing has been painted with mold resistant paint. Ends of all beams have been covered with moisture barrier.

2011-02-27 2W


Master Bedroom has been painted with mold resistant paint.


Exterior wall of 2nd Bedroom has been painted with mold resistant paint. Insulation has been installed along exterior wall.


Kitchen area has been covered with plastic and cardboard.

2011-02-27 2E


Guest washroom painted.


Painter is painting 2nd bedroom.



Corridor looking toward washer/dryer closet is painted.


Corner wall of Master bedroom has been dried out since ice dam caused water to soak into masonry wall. Insulation has been put back in wall.

2011-02-27 1W


Master Bedroom is fully dry walled.


Corridor looking toward washer/dryer closet is dry walled.


Corridor at furnace closet is dry walled.


2nd Bedroom is fully dry walled.


Living Room ceiling has been fully dry walled.


Living Room ceiling has been fully dry walled.


Living Room ceiling has been fully dry walled where new LVL beam was installed.

2011-02-27 1E


Corner wall of Master bedroom has been dried out since ice dam caused water to soak into masonry wall. Insulation has been put back in wall.


Corner wall of Master bedroom has been dried out since ice dam caused water to soak into masonry wall. Insulation has been put back in wall.


Master Bath room has been fully dry walled.

Friday, February 25, 2011

2011-02-25 GE


New copper pipes in Master Bathroom from Corridor.


New copper pipes in Master Bathroom from Corridor.


Pipes exposed in ceiling above Washer/dryer closet.

2011-02-25 3E


Appliances are being removed from Kitchen. All cabinets are covered in plastic.

2011-02-25 3W


Lights are being installed in Kitchen/Dining area.


Electrical work being done in Kitchen/Dining area.

2011-02-25 2E


Fireplace in Living/Dining covered with cardboard. Refrigerator covered in plastic. Ceiling fans covered in plastic


All kitchen cabinets are covered with cardboard and plastic. Ceiling fans and lights are covered with plastic.

2011-02-25 1W


Drywall contractor installs drywall on west wall of 2nd bedroom.



Master Bedroom closets are prepped and ready to receive drywall.


Drywall contractor in Master Bedroom cuts drywall.

Thursday, February 24, 2011

2011-02-24 GE


Master Bathroom Jacuzzi on the left, Master Bedroom in the background, insulated window box to the right.


Plywood boards are being cut and fitted for sub floor.


Plywood sub floor is being installed in corridor.

2011-02-24 2W


Master bathroom toilet sits temporarily in Living Room as contractors work on floors and walls for Master Bathroom and Master Bedroom. Fire place and cabinets are covered with cardboard and plastic.


LVL beam in Living Dining Room to be covered with drywall.


West wall of 1st Bedroom has been insulated where drywall had to be removed due to mold.


West wall of 2nd Bedroom has been fully insulated.


West wall of 2nd Bedroom and Master bedroom have been fully insulated.


South wall of unit has been fully insulated.

2011-02-24 1W


Living Room ceiling opened exposing structure above.


New LVL beam bearing on East Masonry wall between kitchen and dining room.


New LVL beam bearing on East Masonry wall between kitchen and dining room.


New LVL beam bearing on East masonry wall.


New LVL beam in ceiling, Kitchen cabinets in background wrapped with plastic.

Monday, February 21, 2011

2011-02-21 3E


East wall of Master Bedroom is fully insulated.


East wall of Master Bedroom and 2nd bedroom is fully insulated.