2011-02-24 GE
Master Bathroom Jacuzzi on the left, Master Bedroom in the background, insulated window box to the right.
Plywood boards are being cut and fitted for sub floor.
Plywood sub floor is being installed in corridor.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Followers
Blog Archive
▼
2011
(78)
►
September
(2)
►
March
(16)
▼
February
(25)
2011-02-27 3W
2011-02-27 3E
2011-02-27 Stairway
2011-02-27 2W
2011-02-27 2E
2011-02-27 1W
2011-02-27 1E
2011-02-25 GE
2011-02-25 3E
2011-02-25 3W
2011-02-25 2E
2011-02-25 1W
2011-02-24 GE
2011-02-24 2W
2011-02-24 1W
2011-02-21 3E
2011-02-21 3W
2011-02-21 2W
2011-02-05 Ice Dam - Damn Ice!
2011-02-04 3E
2011-02-04 2E
2011-02-03 1E
2011-02-01 3E
2011-02-01 2E
2011-02-01 1E
►
January
(35)
►
2010
(32)
►
December
(9)
►
November
(3)
►
October
(8)
►
September
(1)
►
August
(3)
►
July
(3)
►
June
(5)
About Me
Derrick J. Donnella
Chicago, Illinois, United States
Architectural Project Manager, Construction Manager, Photographer, Blogger
View my complete profile
No comments:
Post a Comment