Friday, February 25, 2011

2011-02-25 1W


Drywall contractor installs drywall on west wall of 2nd bedroom.



Master Bedroom closets are prepped and ready to receive drywall.


Drywall contractor in Master Bedroom cuts drywall.

Thursday, February 24, 2011

2011-02-24 GE


Master Bathroom Jacuzzi on the left, Master Bedroom in the background, insulated window box to the right.


Plywood boards are being cut and fitted for sub floor.


Plywood sub floor is being installed in corridor.

2011-02-24 2W


Master bathroom toilet sits temporarily in Living Room as contractors work on floors and walls for Master Bathroom and Master Bedroom. Fire place and cabinets are covered with cardboard and plastic.


LVL beam in Living Dining Room to be covered with drywall.


West wall of 1st Bedroom has been insulated where drywall had to be removed due to mold.


West wall of 2nd Bedroom has been fully insulated.


West wall of 2nd Bedroom and Master bedroom have been fully insulated.


South wall of unit has been fully insulated.

2011-02-24 1W


Living Room ceiling opened exposing structure above.


New LVL beam bearing on East Masonry wall between kitchen and dining room.


New LVL beam bearing on East Masonry wall between kitchen and dining room.


New LVL beam bearing on East masonry wall.


New LVL beam in ceiling, Kitchen cabinets in background wrapped with plastic.

Monday, February 21, 2011

2011-02-21 3E


East wall of Master Bedroom is fully insulated.


East wall of Master Bedroom and 2nd bedroom is fully insulated.

2011-02-21 3W


West wall Master Bedroom fully insulated.


South wall fully insulated.

2011-02-21 2W


Contractor installs new LVL structural beams between kitchen and Dining/Living Room.