Wednesday, September 29, 2010

2010-09-28


Bricks have been removed where roof meets wall. Masons are installing new brick on the exterior of the building up to the underside of wood joists.


View from unit 3W looking up at ceiling/roof from Living Room.


View from unit 3W looking up at ceiling/roof from Kitchen.


View from 3W looking up at ceiling/roof from bedroom.


View from 3W looking up at ceiling/roof from bathroom.


View from 3W looking up at ceiling/roof from Master Bedroom.

Friday, August 6, 2010

2010-08-04 - Unit GE


Unit GE – Finished floor and baseboards in master bedroom have been removed. Pools of water are found on top of concrete slab-on-grade. Bedroom door, closet doors and vanity are sitting in pools of water.


Unit GE – Whirlpool bathtub sits on plywood. Plywood is soaking wet.


Unit GE – Master bathroom floor is covered with rain water.


Unit GE – Wall between master bath and bedroom corridor have been removed exposing rear of electric panel.


Unit GE – Finished floor, base board and gyp board have been removed from corridor. Concrete floor slab is covered with water.


Unit GE – Exterior wall in master bedroom below window sill and including window sill are covered with new mold growth.


Unit GE – Mold is starting to grow on walls of Washer/Dryer closet.


Unit GE – Steel beam appears to be supported by wood stud wall.

Thursday, August 5, 2010

2010-08-04 - Electrical Concerns


ComEd electricity for Eastwood Commons comes from the alley through the master bedroom in unit GE. Eight conduits run to each of the eight condo units.


A heavy rain came through Wednesday morning and all eight conduits are soaked and dripping in water.


Water is dripping from conduits at or near couplings. Couplings do not appear to be water tight. JBD will investigate this situation with their electrician tomorrow, Thursday, August, 05, 2010.


Conduits shown branch west to west condo units and up to the east bank of condo units. They are all soaking wet.

Monday, August 2, 2010

2010-08-02_3W


Unit 3W - Master bedroom - View looking through master bedroom closet into 2nd bedroom. White PVC pipes in background are plumbing pipes in the 2nd bathroom. All gyp bd ceilings and finished flooring have been removed.


Unit 3W - Master Bedroom – Brick wall meets roof. Blue temporary tarp can be seen between roof joist where storm pulled off parapet and roof. 3W took on the most amount of damage from the storm.


Unit 3W – Master Bedroom – Blue tarp temporary roof can be seen through roof deck.


Unit 3W - Master Bedroom – Finished floor, sub floor and floor planks have been removed in closet. Closet is open to closet below on the 2nd floor.

¬
Unit 3W – Master bedroom – Vanity temporarily located in master bedroom. Bucket in middle of room to collect water from roof.


Unit 3W - Master Bathroom – Gypsum board walls have been removed from bottom 4 feet of walls. Toilet and vanity have been removed. Finished marble floor and sub floor have been removed. Door has been removed.


Unit 3W – Master Bathroom – Gypsum board ceiling has been removed.


Unit 3W – Master Bathroom – Bathtub and marble tile surrounding tub are still in place.


Unit 3W – Master Bathroom – Gyp board ceiling and light fixtures have been removed. Bathtub and marble tile surrounding tub are still in place.


Unit 3W - Hallway - Gyp bd removed from hallway walls. Washer & Dryer removed from closet. Finished floor and sub floor removed from hallway. Gyp bd ceiling removed.


Unit 3W - Laundry Closet – No ceiling in washer dryer closet.


Unit 3W - HVAC Closet – HVAC unit removed from closet.


Unit 3W – 2nd Bedroom – Mold is forming in bottom of closet.


3rd Bedroom – Gyp bd ceiling has been removed.


Unit 3W - Kitchen/Dining/Living Room – Gyp bd ceiling and soffit in Kitchen Dining Living Room area has been completely removed.


Unit 3W - Kitchen/Dining/Living Room – Ceiling in Kitchen Dining Living Room area has been completely removed


Unit 3W - Kitchen/Dining/Living Room – Kitchen cabinets and appliances have been removed from kitchen.


Unit 3W - Kitchen/Dining/Living Room – Kitchen cabinets and appliances have been removed from kitchen.


Unit 3W - Kitchen/Dining/Living Room – Finished floor, sub floor, baseboards and some floor planks have been removed from Dining Room.


Unit 3W - Kitchen/Dining/Living Room – Kitchen cabinets and appliances have been temporarily moved to living room.


Unit 3W - 2nd Bathroom –Ceiling in 2nd Washroom has been removed.


Unit 3W - Linen closet –Finished floor and baseboards have been removed from linen closet.


Unit 3W - Entry Closet –Finished floor and baseboards have been removed from entry closet.

Thursday, July 15, 2010

2010-07-09 Unit 1E


Unit 1E - 2nd bdrm, finished floor fully removed, most of the plywood subfloor has been removed and sections of the plank floor have been removed. Gyp bd ceiling in unit below has been removed as you can see from the 1st floor unit into the basement unit.



Unit 1E - 2nd Bedroom looking up into unit above, ceiling has been fully removed. Original joists are shown sistered together with newer joists.



Unit 1E - Master bedroom finished floor and baseboards fully removed. Portion of sub floor removed. Gyp bd ceiling and molding fully removed. Gyp bd surrounding master bath fully removed.


Unit 1E - Master bath gyp bd ceiling and trim fully removed.



Unit 1E - Master bedroom, gyp bd ceiling removed, east wall with trim removed.



Unit 1E - Master bedroom, south elevation, gyp bd walls and ceiling fully removed.



Unit 1E - Master bedroom looking west, gyp bd walls and trim fully removed except around door.

Monday, July 12, 2010

2010-07-09 Unit GE


Unit GE - Master bedroom, looking west toward master bathroom, gyp bd removed from west wall and ceiling. Masterbath cabinet has been pulled from bathroom. Finished floor is still in place.


Unit GE - Master bedroom, south elevation, gyp bd wall fully removed. Bathroom cabinet sits in Master bedroom.


Unit GE - 2nd bedroom, gyp bd ceiling is fully removed.


Unit GE - 2nd bedroom closet, bottom 4’-0” of gyp bd removed. Finished floor is still in place.


Unit GE - 2nd bedroom east wall, baseboards and ceiling trim removed. Finished floor is still in place.