Friday, June 25, 2010
2010-06-24
Second tarp installed over 35' of roof at rear of building.
Front NE parapet along Eastwood Ave being removed. Bricks fall apart with the squeeze of my hand. Mason removing parapet wall.
Unit 3W all gypsum board removed from Master Bedroom
Front facade of building. Parapet being removed from top of wall.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment