Wednesday, June 30, 2010

2010-06-29


Unit 3W Master Bedroom, damaged finished flooring has been removed. A portion of damp plywood sub-flooring has been removed and planks underneath are shown. JBD is methodically checking floor assembly for moisture and water damage.


Unit 3W Kitchen microwave and wall cabinets have been removed.


Unit 3E Corridor from rear entrance looking north toward washer/dryer. Damaged gypsum board walls have been removed. JBD is methodically checking wall assemblies for moisture and water damage.


Unit 2W, all personal belongings and furniture have been moved from two (2) bedrooms to Living/Dining/Kitchen area.


Unit 2W, mold found on west wall of Master Bedroom. JBD will remove gyp bd walls to mitigate mold.

No comments:

Post a Comment