Thursday, December 16, 2010

2010-12-16 Unit 3E


Newly installed joists in Living Room with moisture barrier applied along demising wall between Unit 3E & 3W.


Kitchen protected with plywood, cardboard and plastic.


Gypsum board has been fully removed from Master bedroom. Plywood subfloor has been installed in Master bedroom.


Gypsum board has been fully removed from Master bedroom. Plywood subfloor has been installed in Master bedroom and Master bath.


Gypsum board has been fully removed from Master bedroom. Plywood subfloor has been installed in Master bedroom and Master bath.


Gypsum board removed from demising wall in corridor from rear deck. Plywood subfloor has been installed in corridor.

No comments:

Post a Comment