Friday, January 7, 2011

2011-01-07 2E


Closet in 2nd Bedroom has been framed. New joists have been set above header. New plywood sub-floor has been installed.


New sub-floor has been installed in 2nd Bedroom, Closet and Main Corridor.


Existing plumbing pipes to Guest Bathroom are exposed to 2nd Bedroom.


Existing plumbing pipes to Guest Bathroom are exposed to 2nd Bedroom.


Existing plumbing pipes to Guest Bathroom are exposed to 2nd Bedroom.


East wall and ceiling are exposed.


Ceiling is exposed. Existing supply duct and vent are shown on the leftt. Three (3) new joists are shown in the center. Existing washer/Dryer exhaust duct is shown on the right venting to outside of building.


East wall with existing wood furring strips.