Several pipes burst on Friday, January 21, 2011 between 4pm and 5pm. Building water was turned off by 5pm and the Contractor repaired pipes Friday evening. The thermostat was set for 70˚ but the actual temperature reading was 55˚. There appears to be a problem with the HVAC system. The Contractor is investigating this situation.
The newly installed plywood subfloor has been pulled out of Master Bedroom to allow air scrubbers and fans to rid unit of excess moisture.
Plywood subfloor has been removed from 2nd Bedroom. Air scrubber and fan are running to rid unit of excess moisture.
Plywood subfloor has been removed in hallway from back door to front door.
Two (2) fans and an air scrubber have been set up in the Living Room area to remove excess moisture from unit.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment