Thursday, July 15, 2010

2010-07-09 Unit 1E


Unit 1E - 2nd bdrm, finished floor fully removed, most of the plywood subfloor has been removed and sections of the plank floor have been removed. Gyp bd ceiling in unit below has been removed as you can see from the 1st floor unit into the basement unit.



Unit 1E - 2nd Bedroom looking up into unit above, ceiling has been fully removed. Original joists are shown sistered together with newer joists.



Unit 1E - Master bedroom finished floor and baseboards fully removed. Portion of sub floor removed. Gyp bd ceiling and molding fully removed. Gyp bd surrounding master bath fully removed.


Unit 1E - Master bath gyp bd ceiling and trim fully removed.



Unit 1E - Master bedroom, gyp bd ceiling removed, east wall with trim removed.



Unit 1E - Master bedroom, south elevation, gyp bd walls and ceiling fully removed.



Unit 1E - Master bedroom looking west, gyp bd walls and trim fully removed except around door.

Monday, July 12, 2010

2010-07-09 Unit GE


Unit GE - Master bedroom, looking west toward master bathroom, gyp bd removed from west wall and ceiling. Masterbath cabinet has been pulled from bathroom. Finished floor is still in place.


Unit GE - Master bedroom, south elevation, gyp bd wall fully removed. Bathroom cabinet sits in Master bedroom.


Unit GE - 2nd bedroom, gyp bd ceiling is fully removed.


Unit GE - 2nd bedroom closet, bottom 4’-0” of gyp bd removed. Finished floor is still in place.


Unit GE - 2nd bedroom east wall, baseboards and ceiling trim removed. Finished floor is still in place.

Friday, July 2, 2010

2010-06-30


Unit 3W-Bedroom closet, finished floor has been completely removed from bedroom. Sections of subfloor have been removed revealing mold on plank boards. In the foreground, some wet plank boards have been removed and there are signs of mold on bottom of floor joists.


Unit 3W-Master Bedroom and closet adjoining bathroom, finished floor has been completely removed from Master Bedroom. Sections of subfloor have been removed revealing mold on plank boards.


Unit 3W-Bedroom, kitchen wall cabinets are temporarily being stored in Bedroom.

Wednesday, June 30, 2010

2010-06-29


Unit 3W Master Bedroom, damaged finished flooring has been removed. A portion of damp plywood sub-flooring has been removed and planks underneath are shown. JBD is methodically checking floor assembly for moisture and water damage.


Unit 3W Kitchen microwave and wall cabinets have been removed.


Unit 3E Corridor from rear entrance looking north toward washer/dryer. Damaged gypsum board walls have been removed. JBD is methodically checking wall assemblies for moisture and water damage.


Unit 2W, all personal belongings and furniture have been moved from two (2) bedrooms to Living/Dining/Kitchen area.


Unit 2W, mold found on west wall of Master Bedroom. JBD will remove gyp bd walls to mitigate mold.

Tuesday, June 29, 2010

2010-06-28


Unit 3W Masterbed Room looking thru closets north into 2nd bedroom.


Unit 3W Living Room with gyp bd ceiling removed.


Unit 3W Living Room joists supporting roof. Batt insulation lies on gyp bd ceiling. Left joist sags.


Unit 3W Living Room existing wood framing for gyp bd ceiling.

Saturday, June 26, 2010

2010-06-26


Crack in rear wall above arched window unit 3W


Top of rear wall, newer brick meets older brick unit 3E



Masons removing brick from front parapet along Eastwood Ave

Friday, June 25, 2010

2010-06-24


Second tarp installed over 35' of roof at rear of building.


Front NE parapet along Eastwood Ave being removed. Bricks fall apart with the squeeze of my hand. Mason removing parapet wall.


Unit 3W all gypsum board removed from Master Bedroom


Front facade of building. Parapet being removed from top of wall.