Saturday, March 5, 2011

2011-03-05 2E


Jacuzzi tub covered with drywall ready for tile.


Jacuzzi tub covered with drywall ready for tile.

2011-03-05 1E


Jacuzzi tub ready for gyp board.


Jacuzzi tub ready for gyp board.

Tuesday, March 1, 2011

2011-03-01 3E


Batt insulation is being installed in between roof joists in Master Bedroom.


Batt insulation is being installed in between roof joists in Master Bedroom.


Batt insulation is being installed in between roof joists in Master Bedroom.


Batt insulation has been installed between roof joists above Entry Closet.


The roof above the Living/Dining & Kitchen areas is fully insulated with batt insulation.


The roof above the Living/Dining & Kitchen areas is fully insulated with batt insulation.


The roof above the Kitchen is fully insulated with batt insulation.


The roof above the Living Room and corridor is fully insulated with batt insulation.

2011-03-01 3W


Drywall sits in Master Bedroom


Worker prepares to cut dry wall for installation.


Looking up at ceiling of Washer/Dryer closet, workers have started to install batt insulation between roof joists.


Worker installs batt insulation between roof joists in 2nd Bedroom.

2011-03-01 2E


New doors are drying after being painted.


Kitchen area protected with cardboard and plastic.


Doors and trim have been removed in corridor.


2nd Bedroom is being painted.


Corner of Master Bedroom awaits drywall.


Wood flooring has been delivered and acclimates to on-site conditions before being installed throughout the building.


Master Bath cement board has been taped and is ready for paint.

2011-03-01 2W


View of Master Bedroom looking north towards closets, 2nd bedroom in the background.


Door knobs sit on bathroom countertop. Most door knobs are to be replaced.


All electric wiring and controls are being checked.


Openings in floors and ceilings are being filled with fire safing.


Openings in floor around perimeter of washroom are filled with fire safing.


Openings in floor underneath Jacuzzi tub is filled with mineral wool fire safing.



Openings in ceiling around various plumbing pipes are filled with fire safing.

2011-03-01 GE


Workers are installing drywall, doors and frames and sub floor in Master Bedroom.


Workers are installing drywall, doors and frames and sub floor in Master Bedroom.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Kitchen counters and base cabinets are protected with cardboard while various materials are stored in Dining Room area.


Drywall has been installed over chase wall behind toilet and vanity.