Tuesday, March 1, 2011

2011-03-01 GE


Workers are installing drywall, doors and frames and sub floor in Master Bedroom.


Workers are installing drywall, doors and frames and sub floor in Master Bedroom.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Workers are installing drywall, doors and frames and sub floor in Corridor.


Kitchen counters and base cabinets are protected with cardboard while various materials are stored in Dining Room area.


Drywall has been installed over chase wall behind toilet and vanity.