Tuesday, March 1, 2011
2011-03-01 2W
View of Master Bedroom looking north towards closets, 2nd bedroom in the background.
Door knobs sit on bathroom countertop. Most door knobs are to be replaced.
All electric wiring and controls are being checked.
Openings in floors and ceilings are being filled with fire safing.
Openings in floor around perimeter of washroom are filled with fire safing.
Openings in floor underneath Jacuzzi tub is filled with mineral wool fire safing.
Openings in ceiling around various plumbing pipes are filled with fire safing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment